RCW
The development of 40 apartments in Stretford, Manchester.
Client: Heatley Developments
Scope of Works: Groundworks.
Duration: On Going
Carbon Neutral Construction started on site aiding in the the site remediation and the sheet piling/capping beam before forming the road and sub road drainage/services.
CNC engineer and operatives aided in the CFA piling
CNC carried out the Reduce level and foundation dig set out by our engineers.
Once the building was erected CNC came back to site and completed Phase 2 of the road and associated drainage/outfall. along with slabs, preparation of the carpark and plot drainage.